National Repository of Grey Literature 2 records found  Search took 0.00 seconds. 
Analysis of parallel operation of nodal areas of 110 kV Krasikov and Neznasov transformers stations
Kostkan, Petr ; Kopička, Marek (referee) ; Ptáček, Michal (advisor)
Currently, the nodal areas of Neznášov substation and Krasíkov substation, which belong to ČEZd distribution network 110 kV – East, are operand as separate units. In the defined setting, each nodal area comprises of two 400/110 kV transformers. In the case of failure of the transformer T401 or T402, the criterion N-1 for twenty percent of the rated output is not met. Such problem can be solved by parallel operation of nodal areas of Neznášov substation and Krasíkov substation. The principal as well as practical aim of this thesis is to interconnect the bridge operated connection in separated areas into parallel/loop operation of nodal areas (supplied by 400/110 kV transformers). Computing software is used to calculate the steady state and short-circuit conditions in the distribution network 110 kV for separate and parallel operation of mentioned nodal areas. Power flow analysis is aimed at assessment and evaluation of voltage conditions, transformers loading (400/110 kV and 110/vn) as well as 110 kV lines loading. Obtained short-circuit indices is used to examine short-circuit, withstand capability of the 110 kV substation. Finally, benefits as well as drawbacks of the separate and parallel operation are compared and evaluated. If necessary, the technical arrangements are proposed/designed in order to allow parallel operation of nodal areas Neznášov substation and Krasíkov substation.
Analysis of parallel operation of nodal areas of 110 kV Krasikov and Neznasov transformers stations
Kostkan, Petr ; Kopička, Marek (referee) ; Ptáček, Michal (advisor)
Currently, the nodal areas of Neznášov substation and Krasíkov substation, which belong to ČEZd distribution network 110 kV – East, are operand as separate units. In the defined setting, each nodal area comprises of two 400/110 kV transformers. In the case of failure of the transformer T401 or T402, the criterion N-1 for twenty percent of the rated output is not met. Such problem can be solved by parallel operation of nodal areas of Neznášov substation and Krasíkov substation. The principal as well as practical aim of this thesis is to interconnect the bridge operated connection in separated areas into parallel/loop operation of nodal areas (supplied by 400/110 kV transformers). Computing software is used to calculate the steady state and short-circuit conditions in the distribution network 110 kV for separate and parallel operation of mentioned nodal areas. Power flow analysis is aimed at assessment and evaluation of voltage conditions, transformers loading (400/110 kV and 110/vn) as well as 110 kV lines loading. Obtained short-circuit indices is used to examine short-circuit, withstand capability of the 110 kV substation. Finally, benefits as well as drawbacks of the separate and parallel operation are compared and evaluated. If necessary, the technical arrangements are proposed/designed in order to allow parallel operation of nodal areas Neznášov substation and Krasíkov substation.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.